Basement Finish, Oshawa
Oshawa · Winter 2025–26
A full basement with a bathroom, taken from bare concrete to finished over the winter of 2025–26.
- 01Framing
- 02Insulation
- 03Drywall with pot lights
- 04Bathroom rough-in
- 05Finishes