Front Entry Leak Repair, Richmond Hill

Richmond Hill · 2026

The front entry was rebuilt after a leak from outside: new framing, sheathing and weatherproofing, then windows, a new door and stone cladding.

The rebuilt front entry with stacked-stone cladding, new windows and black double doors
The front entry before the rebuild: brick porch with green double doors
BeforeAfter
← drag →

The front entry before the leak repair and after the rebuild.

The front entry before the leak repair and after the rebuild.
The work

What we did

  1. 01New framing
  2. 02Sheathing and weatherproofing
  3. 03Windows and a new door
  4. 04Stacked-stone cladding
Close view of the rebuilt entry: stacked-stone cladding around black double doors with glass sidelights
Finished
The entry rebuild in progress: new framing sheathed and wrapped in house wrap
Sheathing and weatherproofing